Pioneer Energy: Diesel Storage Terminal

Project Reference · Tanks & Terminals

Pioneer Energy: Diesel Storage Terminal

Turnkey Port-Integrated Diesel Storage

Diesel terminal EPC at Mackay Port in Queensland, covering 75,000 m³ of storage, transfer systems and the infrastructure needed for port-side fuel handling.

LocationMackay Port, Queensland, Australia
ClientPioneer Energy Pty Ltd
DeliveryEPC
StatusCompleted
75,000 m³41 m max diaPort-based EPC

Project Overview

Chemie-Tech delivered a diesel storage terminal for Pioneer Energy at Mackay Port in Queensland under an EPC model. The project combined tankage with associated terminal infrastructure, requiring a delivery approach suited to port logistics, industrial interfaces and dependable handover of a working fuel storage asset.

Project Context

Port locations compress the available construction window. Deliveries, laydown, marine-side constraints and operational access all put pressure on sequencing and material flow.

Chemie-Tech Role

Chemie-Tech responded with a schedule-driven EPC plan linking procurement dates, fabrication readiness, site access and system completion milestones so the terminal could progress without avoidable stoppages.

Delivery Status

The diesel storage terminal EPC scope is recorded as completed.

Verified Scope

  • Engineering, procurement and construction
  • Tankage and foundations
  • Piping and associated terminal infrastructure
  • Utility and E&I interfaces
  • Testing and handover