Project Overview
Chemie-Tech delivered EPC scope for a 12,000 BPD crude modular refinery in the UAE, covering process units, utilities and tank farm scope within one integrated delivery package. The package integrates compact process-plant infrastructure with linked storage and utility systems.
Project Context
Small-footprint modular refineries still carry full-process complexity. The challenge was fitting process units, utilities, storage and tie-ins into a tighter physical and schedule envelope.
Chemie-Tech Role
Chemie-Tech treated the facility as one integrated plant package, using coordinated engineering and modular execution logic to reduce site congestion and keep process, utility and storage systems aligned.
Delivery Status
The 12,000 BPD modular refinery EPC scope is recorded as completed.
Verified Scope
- Engineering, procurement and construction
- Process units
- Utilities and offsites
- Tank farm scope
- Interconnecting piping, E&I and commissioning support